File:2000 08 06.jpg: Difference between revisions
Appearance
Alyssa Soto (talk | contribs) No edit summary |
Alyssa Soto (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
{{Information | |||
| Date = 2000 August 6 PNJ | |||
| Title = Build the Garcon Point Bridge | |||
| Medium = Ink on paper | |||
| Size = 12 in. x 9 in. | |||
| Description = Accompanying the editorial ‘Caution warranted on I-110 traffic’ concerning the need for extending I-110 to Nine Mile Road as a toll road in light of the falling revenues and dismal use statistics for the Garcon Point Bridge. | |||
}} | |||
[[Category:Garson_Point_Bridge]][[Category:Infrastructure]] | |||
Latest revision as of 19:29, 5 September 2013
| Date Published: | 2000 August 6 PNJ |
| Title: | Build the Garcon Point Bridge |
| Medium: | Ink on paper |
| Size: | 12 in. x 9 in. |
| Description/Context: | Accompanying the editorial ‘Caution warranted on I-110 traffic’ concerning the need for extending I-110 to Nine Mile Road as a toll road in light of the falling revenues and dismal use statistics for the Garcon Point Bridge. |
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 19:28, 5 September 2013 | 3,474 × 2,628 (980 KB) | Alyssa Soto (talk | contribs) |
You cannot overwrite this file.
File usage
There are no pages that use this file.